on 03-15-2007 1:35 PM
I know PP/DS plans at storage location level within a plant, but do SNP plan at storage location level too?
Thanks
Mono
<b>Re: Mapping ATP categories</b>
Hai Mono,
As far as I know, SNP can plan at Storage location MRP area level. I am not sure whether it can plan at storage location level, if we do not configure MRP area.
Regards,
Murali.J
<b>Re: Mapping ATP categories</b>
Murali has answered your question. Storage location in R/3 needs to be assigned to a MRP Area. This MRP Area when transferred to APO becomes a separate location (Type 1007) with its own location-products. Then you can run SNP or PPDS planning at that location without any issues.
Thanks,
Somnath
Murali/ Somnath:
I have created a new thread for the same, I was wondering in my case on R/3 side storage location are not assigned to a MRP area, that means I cant plan my storage locations in SNP?
Thank you
Mono
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
8 | |
4 | |
3 | |
2 | |
2 | |
1 | |
1 | |
1 | |
1 | |
1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.