staging material for production

Former Member
0 Kudos

Hi Friends,

I am referring prerequisited for material staging for production in that below is the point.

  • You have defined storage location 0092 in such a way that the system does not transfer this storage location to the transfer requirement.

How can we achieve this prerequisites.

Accepted Solutions (0)

Answers (1)

Answers (1)

JL23
Active Contributor
0 Kudos

in Logistics Execution > Warehouse Management > Interfaces > Inventory Management > Define storage location control

in the first activity of this customizing you can define in the detail view if you copy the storage location into the TR