Dear All,

I have a problem with the material length on SNC. When a PO is confirmed and published, an xml is created and the internal id of the material has 40 chars.

Sender Interface: ReplenishmentOrderConfirmation_Out

When the Idoc is processed at ECC, an error is presented because the material length only supports 35 chars as the picture below.

Is there a way to avoid this situation on SNC using a BAdI to manipulate this value before transfer the xml to ECC?

Thanks,

Alberto.

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Hi Alberto,

Have you maintained Output format of product number?

If no then go to SPRO >> SCM Basis >> Master Data >> Product >> Specify Output Formate of Product Number

Product No.length=18

save this entry.

Regards,

Nikhil

Answers (1)

Answers (1)

0 Kudos

Hi, Alberto:

     Try to implement the BAdI /SCA/BIF_ME_PROD_ID.