cancel
Showing results for 
Search instead for 
Did you mean: 

DIP

Former Member
0 Kudos

Dear... Pls share Step by step configuration of DIP Process

bz i have checked in Google but i am not able to find it .. plz

thanks a lot

Accepted Solutions (0)

Answers (2)

Answers (2)

Former Member
0 Kudos

Hi, I recently came across this document, please check the link it may help you

http://www.scribd.com/doc/7380696/Customization-Document-DIP-Profile-ZCSBILL

former_member186385
Active Contributor
0 Kudos

Hi,

DIP is dynamic Item Processor Profile

This is used for Billing customer based on the Resources Utilized and time consumed ( basically in Time and Material Scenario)

DIP is used in RRB billing

This is configured in ODP1 transaction code

This configuration includes,

     Usage

     Characteristics

     Source

     Source criteria

     Material Determination

     Criteria

In the usage field, you can find the objects for which you want DIP to use

either it can be

      Billing and result analysis

     Quotation creation

Characteristics includes, Material, Cost center, cost element, Activity types, billing form

Source is to determine how the cost has to be flown

     planned cost or actual cost

Material determination is combination of your Dynamic item which represents the Dynamic items in the debit memo

Criteria is used to have your characteristics combination for each Dynamic items

It is just to start with, Hope it is clear. Let me know if you need any further details

regards,

santosh