Has anyone developed procedure to follow to restore a QA HANA system from a backup copy of of the Production HANA system?
Our source systems are ECC 6 and CRM 2007, on SQL Server 2005 on Windows 2003. We have them connected to HANA through SLT 2011 SP5 on NetWeaver 7.31.
I believe we can do database restores much the same as we would do for the SQL databases, but what would the "Post Restore" steps be.
Ken
Hi Ken,
do you have an document or a guideline?