on 11-27-2013 3:43 PM
Hello,
Once we create a delivery for an STO the Planned GI date is set to the same Delivery date as the PO item.
The SAP help on the planned GI date field of the delivery states " The date on which the goods must physically leave the shipping point to reach the customer on time."
Example: (see attached pic)
The Planned GI in the Delivery ignore the Planned delivery time 7 days (from material master) and the 9 days transit time from route. ( 0 day for packing/packing and loading).
The Planned GI in the delivery should be 7+9 days earlier than the Delivery date in the PO item, but I get the same as the PO.
Please advise
Hello Gurus,
Any help ?
Thanks in advance for any answer
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
The Planned GI in the Delivery ignore the Planned delivery time 7 days (from material master) and the 9 days transit time from route. ( 0 day for packing/packing and loading).
Actually,System has to consider 9 days transit time from route.It will consider also.
May I know,where you maintained planned GI date in MM02 ?
Why system is showing planned GI date and Actual GI differently in VL02N?
Thanks,
Naren
HI,
If don't mind ,can you check which route is flowing in delivery level ?
Really ,it is strange to me.If you kept transit time 9 days in route in t.code 0VTC then system has to consider this time.
Ex: if you are going to create delivery on 26/11/2013 system will show you material availability after considering this time.
Kindly , check tab "Processing " in header level in Vl02N. If possible,please share that screen shot.
Thanks,
Naren