on 11-19-2013 11:47 AM
Hello All,
I have a requirement for my client in inspection plan / task list (Q).
I want to assign modification rule in inspection plan for an inspection characteristic. At header level, the Dynamic modification rule is set as
"DMR at characteristic level".
To a particular operation, I have 5 inspection characteristics, in which I have to assign the modification rule to character 0010.
For eg:-
Group - XXXX
Group Counter - 1, 2, 3, 4, 5.
Operation - 0010, 0020, 0030
Inspection characteristic - 0010, 0020, 0030, 0040, 0050.
0010 - MIC00001 (Length)
The red highlighted item is to be assigned with a modification rule "ABC"
With the above input, the system has to pick the right inspection character and assign the modification rule, meaning,
In group XXXX, under which group counter 1, in that operation 0020, in that 0010 inspection character,
with all these input, the character Length in the inspection plan should be assigned with the modification rule "ABC"
In my case I have more than 50K entries to be changed. Its a mass change requirement. How to proceed?
Please help me out. Its a high priority requirement.
Thanks in advance,
Anitha Pauline
You could do this using an LSMW.
First you need to use CWBQM to make sure that the MIC you are updating is ALWAYS char 0010 as you indicated in your posting. You can also check this by using SE16 to look directly at the inspection plan table PLMK.
If the characteristic is at any other position then 0010, you'll need an LSMW recording for each position it occurs in. Then run your LSMW for each group of plans, i.e. run for all plans where it is at 0010, then run for all plans where it's at 0020, etc...
I'm would imagine a good LSMW person could do this as one run. Me.. I'd keep it simple and fast. Especially if the majority of plans have the MIC at position 0010. You might just update position 0010 using the LSMW and do all the others manually using CWBQM.
Craig
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hello Craig,
Its not always the same for all. Each is in different position and also some group will have even at operation 0030 or 0010 and some group might have at group counter 2 or 3 etc. But I have all the data, as in which group counter in that which operation in that which character needs the DMR to be assigned.
Do we not have any other solution for this? Because if I have to do a LSMW recording for each of those combinations then I will end up in creating a minimum of 100 recordings at least. Hope you can understand my issue.
I can understand its a complex requirement. But I need a fair method to satisfy the need.
Thanks,
Anitha Pauline.
SAP provides a standard program for loading plans.
You could basically export your plans and create a new load file with the changes.
See this thread: http://scn.sap.com/thread/1143965
I have used this to basically duplicate production plans used for 04 inspections, to another usage for manual lots, 89.
You could do the same, just edit the file and make the replacement before loading.
Craig
I think you can achieve this through CWBQM transaction.
Use working area as Q_TSK_000000000010, and explore at inspection characteristic level.
Regards, Anand
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
HI Anitha,
Pl clear my doubt. You want to re assign the modified MIC (Length) in multiple inspection plans. Is that all ?
If this is what you are looking for, then do the following for mass change.
Go to CWBQM
1. In the tab 'Operation' enter the plant and group number.
2. In the tab 'inspection characteristic' enter the MIC (length)
3. Now 'Load task lists'
4. In the next screen, go to 'task list' and click on 'Inspection characteristics'
5. In the table below, you would see a column for MIC. Use filter to pick 'Length'
6. Then using ctrl+y, delete the version (1) and press enter. Your new MIC would be updated.
Regards,
ntn
Message was edited by: ntn J
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Well, I think you have the required set of information with you, that for which group and its counter and for which operation which MIC needs to be modified (addition of DMR). Just keep this information in excel sheet for time being.
The alternatives you may have are,
Regards, Anand
Hello Mr. Rao,
I have a doubt in this, If I have to do the recording, should I use T code QP02 or CWBQM.
Also that my Abaper was telling that those screens are called as Table control and it cannot be edited or recorded using LSMW. Is it so? Ultimately I need to finish the task, so I decided to segregate the data according to the combinations. So do let me know in detail the steps please.
Thanks,
Anitha Pauline
As per my understanding LSMW by recording method for QP02 faces few problems if the recording sequence is not adhered. This happens because at the time of recording you choose say operation 10 and MIC 10. But while uploading the data for operation 120 (where you have reach by scrolling down in QP02) the screens are different which (scrolling down activity) was recorded earlier. Here LSMW has few limitations.
That's why my preferences would be as follows
You have chosen the right way to carry out these through CWBQM by running it several time for different different combination.
User | Count |
---|---|
108 | |
12 | |
11 | |
6 | |
5 | |
4 | |
3 | |
3 | |
3 | |
3 |