on 11-06-2013 9:09 PM
Hello,
Our team has a requirement in which we need to plan the supply to several storage locations, without considering the available stock in these destinations. We would like to know how to configure this so that the CC categories in the ATD ratios does not upload to SNP. We tried modifying master data by changing the ATD issue, receipt and category group but did not suceed. Since we have not found a solution, what we do is delete the CC category by the RLCDELETE transaction every time we need to plan, but the moment we do this, the stock uploads to SNP in a very short time.
Your help would very much be appreciated. Please also consider that we cannot modify any ABAP coding in SCM or establish any user exits.
Thank you.
Thank you everyone for your help. We managed to use a Z transaction in which we can specify which storage locations and batches we need to ignore in the planning process, so that the corresponding CC stock categories do not CIF to SNP. Any remaining CC receipts are forced back to R/3 through the /SAPAPO/CCR transaction.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Maria,
Can you please explain the exact business logic driving this requirement, will help in understanding your requirement better.
Do you use CC stock anywhere in APO.
Rgds
Sourabh
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Sourabh, thank you very much for your reply,
We are using SNP heuristics to plan the distribution of finished product from a central warehouse, directly to several client locations (stores). As we know, in order to establish the amount of product to be deployed in TLB, SNP first considers the demand of each product in every location, but subtracts the following quantities: stock in transit, previous distribution orders, and available stock already in the location destination (CC category).
In our business model however, we need to guarantee that the exact amount of product that is demanded, is the amount that is deployed in TLB. Therefore, SNP must not subtract any quantity from the Demand ratio during the planning process for these specific locations. The number demanded is the number that needs to be ordered.
We are able to delete these ratios from planning by running the RLCDELETE transaction, but this information is continually uploading from R/3 to SCM and syncs within seconds. which is why we need a more permanent solution.
Thank you
Hi Maria,
Have you explored SNP tab in your location master in APO, it has stock category group for stock and category groups assignment option specifically for deployment, i believe it might fit your business requirement, below is the screenshot of same.
So with this you can control what categories you want to be included in SNP run, please check.
Do let me know if you are able to resolve your issue with this.
Rgds
Sourabh
Hi Maria,
May i know which Engine run you are using. Heuristics, Optimizer, CTM in SNP.
You can try to exclude the Supply category CC in the Profile settings For Ex in CTM: In CTM you can configure in the Supply selection --> Order Selection-->ATP Categories--> Remove CC .
Not sure is this answers your question
Please comment.
Tnks
Gani.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.