on 11-06-2013 5:10 AM
Hi Experts,
We are experiencing incorrect behavior in getting the withdrawal quantities from ECC to APO. In RRP3 Forecast tab, the Withdrawal Qty is not converted to the Base Unit or Measure maintained in APO. For example, in ECC the qty is 300 BOT, in APO it is 300 CS. What master data should we check to resolve this issue? I also noticed that the UoM of the MAT1 has a message ' Gross weight is less than net weight'. Does it have any effect on the issue? Thank you.
Regards,
AA
One thing I found as well is that the BOT in ECC is not maintained in APO ( only BT is defined). Do we need to add or change the UoM conversion in APO side manually or get that from ECC? Thanks
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Experts,
I just found this statement over the internet. Can you please confirm on this?
"The base unit of measure recorded in the material master record is always used for the withdrawal quantity."
If that is the case, then our issue can be resolved if we just add BOT in APO and have BOT <-> CS conversion maintained in MAT1. Please confirm. Thank you in advance.
Really looking forward with your assistance.