on 10-25-2013 10:33 AM
Hi Experts,
I am executing location heuristic followed by capacity levelling in SNP. I found issue in only one resource. Capacity levelling is not working for this resource.
Error getting as "Incorrect GUID in table ET_LOC" (Colonm RESIN of table ET_LOC contains GUID zero length.This GUID is not valid.
I tried following things
1.ReCIFed resource by RIMODINI
2.Run OM17 for resource - no inconsistency found.
3. Run LCM CON check
Still issue persists.
One thing I observed- this resource is not available in SAPAPO/RESOURCE table.
Kindly guide me how to proceed to overcome this issue.
Regards
Sachin
Hi
I think it is an inconsistency that happened during the initial transfer of the resource from the ECC.
Approach 1
Try using the change transfer of resource from ECC using the tcode CPF1.
Then run consistency check and OM17 using extended resource check
If this does not work then
Approach 2
delete all PDS related to the resource in APO.
Run a WUF in APO to check if the resource is free. Then delete the resource in APO.
Perform a initial transfer of the resource followed by the PDS / PPM and the transactional data
******************************************************
Come back with your feedback as well
Regards
Ayan Bishnu
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
Checks Whether Resources Exist in LC and Generates Them by using program /SAPAPO/CRES_CREATE_LC_RES and /SAPAPO/CRES_CAPACITY_LENGTHEN Extension of the available capacity of resources in SAP liveCache.
Please try the same and come back.
Regards,
R.Brahmankar
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi
Check if there is a Handling Resource associated with the Location itself and also that this resource exsts in your system.
Regards
Ian
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi, Are you using optimizer method in capacity leveling? This issue may happen if you do not use the correct Resource type, as the SNP optimizer only supports resources of type BUCKET, SINGLE-MIXED,MULTI-MIXED, TRANSPORT, CALENDAR-MIXED.
And what is your resource category? Is it a production resource, strorage resource, or transportation resource?
You can also check below:
1) If using handling resource, do not use shipping calendar (keep this field empty). If using shipping calendar, do the opposite.
2) Check the calendars used for resources (inbound & outbound) and location (receiveing & shipping). They must be the same, otherwise inconsistencies may raise.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.