Dear experts,

I am facing an issue with mopz in Solution Manager 7.1

Basic Configuration and Managed System Configuration were successfully finished.

When trying to create a new Mopz transaction, i am getting the following error:

Input data was initial; enter the product system name

I can get

Solution: SAP Solution

Product Version: Solution Manager 7.1

                                   EHP2 for NW 7.0

but under it:

There is no system for the selected product version.

and I have the error in the logs as mentioned in the title.

Kindly asking your suggestions how to deal with this.

Best regards,

Shkelzen


Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Hi Shkelzen,

Open the LMDB transcation,  goto product system -> enter the system name and check it, whether the system is  avilable?

normally in solman 7.1 not required to create the logical component or solution for MOPZ.

Directly goto LMDB -> product system -> access the MOpz as shown below

Before start the Mopz complete the verfifcation check in the last row.

Check the below blog for assign production system inLMDB.

http://scn.sap.com/community/it-management/alm/solution-manager/blog/2011/12/17/sapadmin-how-to-assi...

Rg,

Karthik

hasanajsh
Active Contributor
0 Kudos

Hi Karthik, karthikeyan

Thanks for your answer.

This is the situation:

Former Member
0 Kudos

Hi,

Please check the nelow note.

It looks to be program error for the patch

SAPKITL705-SAPKITL709

.

Note 1914660 - MOpz: Input data was initial, enter product system name

Thanks

Rishi Abrol

hasanajsh
Active Contributor
0 Kudos

Thanks, I have implemented the note.

Answers (3)

Answers (3)

former_member142535
Participant
0 Kudos

Hi Shkelzen,

Do you manage to solve your problem after implement SAPNOTE 1914460?

I still having the same issue after apply the note.

Regards,

Por.

hasanajsh
Active Contributor
0 Kudos

Hello Por,

Actually, I had implemented the note and still having the same issue (1914660, I think you have a typo). Did you implement it?

What kind of system are you trying to maintain?

Regards,

Shkelzen

former_member142535
Participant
0 Kudos

Hi Shkelzen,

Yes. my SOLMAN is 7.1 and EHP4 for NW7.01.

Looks like the problem is due to Managed system got error.

I will look into the managed system again and will share with you the result after this.

Thank you.

Regards,

Por.

karthikeyan_natarajan4
Active Contributor
0 Kudos

Hi Shkelzen,

Please use Landscape verification check in LMDB (product systems)

Have you created logical components and assigned to solution?

regards

kartik

Former Member
0 Kudos

Hi Shkelzen,

Run SMSY tcode and check if SAP system has assigned production system:

BR,

K.

hasanajsh
Active Contributor
0 Kudos

Hi Kamil,

Thanks for the reply.

that is empty in fact.

I added solution manager abap stack, but now I can only get the system if in Mopz (Enter basic data) I chose:

Solution: No Selection

At this point I am little confused.