on 10-19-2013 5:28 AM
Dear all,
I want to create Quality Inspection for 542 mvt For inspecting the material from vendor (If material is not processed). I have created a new Inspection type 21 for this purpose and assigned to the Inspection lot origin 05 - other goods receipt.
I have assigned the movement type 542 in SPRO -> IMG-> Quality inspection -> Deactivate Quality Inspection for a Movement Type
My Issue is how should I assign the Movement type 542 with inspection type 21 with lot origin 05 ???
So that whenever I reverse the 541 document number, automatically an inspection lot should be triggered for 542 mvt type
Please solve the query
J.Balakrishnan
Hi
In Standard Movement type is assigned to Inspection lot Origin. and 541 and 542 movement is not assigned to any lot origin. That's why lot is not getting generated. Sap does not suggested to allow change of assignment of movement type to lot origin
If you really want to do this you have to check out the following SAP Note. and have to do the settings as suggested by other QM Gurus.
Check SAP note 303061, it says:
"If you must change the assignment from a business point of view, the assignment can be carried out in table T156SY (with Transaction SE16). After this, the functions goods movement, inspection lot creation and usage decision must be tested. If necessary, you must consult SAP."
So yes, in general the assignment should not be changed (and so far I have not had a case where I had to do this). But in general it is possible.
Go through below thread.
http://scn.sap.com/thread/3357552
Reards
Manish
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Sir,
As per your suggestion, I have created a new inspection type "Y33" and assigned with inspection lot origin 05 - Other goods receipt. In OMJJ, I have assigned the Indicator "QM not active" for the movement type 541.
When I create the 542 document, still inspection lot is not getting generated. Please suggest me where I went wrong?
I want the inspection lot to be created when 542 movement is done
Please do the needful
J.Balakrishnan
Hi bala,
In standard SAP, Inspection lots cannot be generated for movement type 542. Therefore, maintaining an inspection type for your material would result in no inspection lots creation. As I also stated before, You cannot set or change the relationship between IL origin and Mov type.
You can try one more option. Create a customer defined movement type, which already has the assignment of appropriate inspection lot origin, and use that for your purpose.
Regards,
ntn
Hi Bala,
Pl go through the following link to find the steps for creating new movement type.
http://scn.sap.com/message/7975631
Once the movement is created, go to config setting and assign the inspection lot origin 05 into it.
Quality Management>> Quality inspection>> Inspection lot creation >> Inspection for goods movement>> Movement Type/Update Control/Inspection Lot Origin
Regards,
ntn
Sir,
Thank you. Let me check and revert back
My Basic doubt is as follows,
How system creates the Inspection lot with inspection type 01 when the GR is done with reference to PO (101 mvt) and similarly how an inspection lot is created with inspection type 03 when we create a production order
ie.., How this configuration / assignment of inspection type and movement type is mapped in SAP?
Is it SAP standard or we can modify this????
Please resolve the silly doubt
J.Balakrishnan
Hi Bala,
That is very basic question and same had come to my mind also during my initial days in QM
If you look at the very first response of mine in this thread, I have mentioned that Relationship between the IL origin and Movement type cannot be changed or set, So I guess it is standard functionality of SAP.
If you follow the path I provided in previous response, you can see that insp lot origin value is maintained for all movement type, wherever applicable. For your case (542), no such value is maintained and is blank.
Regards,
ntn
hi,
First of all, how you created a inspection type 21 in stdn number space, system only allows Z or Y base for customized inspection type.
secndly, go and check in config "Inspection against movement type", against which mvt type you want a QA lot. in that system will tell you after posting the required movement type, particular lot created with specific lot origin type. then go and cretae the Z inpsection type by taking the referrence of that inspection type which is assigned against your required mvt type.
REgards
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Bala,
Are you trying to say that you have set the indicator for deactivating the inspection lot creation for 542 movement, but want to generate the insp lot when 541 is reversed (and 542 takes place)?? Pl correct me if I misunderstood.
Besides, you cannot set or change the relationship between IL origin and Mov type. However, you can control the insp lot creation based on movement type through OMJJ.
Regards,
ntn
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Sir,
I want to inspect the material sent by the vendor if it was not processed by vendor. We create 541 mvt and we dispatch to vendor and when material is received after processing we do GR and inspect with inspection type 01. Similarly, we require inspection lot to be triggered when we reverse 541 mvt document (If vendor has the material without processing). Please provide the steps for activating for this movement type
J.Balakrishnan
Dear Bala,
As I stated earlier
"You cannot set or change the relationship between IL origin and Mov type. However, you can control the insp lot creation based on movement type through OMJJ"
Basically, you need an inspection lot when 542 is made but not when 541 is done, Correct??
05 insp type is correct for this (other GR inspection). Go to OMJJ and deactivate the inspection lot generation for 541 movement. You would get the insp lot only when 542 is made.
Follow the path
OMJJ>> Movement type>> Enter 541 to 542>> Select the row and click on Deactivate QM inspection >> Set the indicator for 'QM not active' for 541 movement.
This should work for you.
Regards,
ntn
Hi Bala,
I did some google and found the following thread which exactly match your requirement. Pl go through it once. Inspection lot for movement type 542 can be generated with customized movement type only as it is not possible for 542 directly.
http://scn.sap.com/thread/1518909
In the above link, procedure for customizing the movement type is also given in the last response. Pl read both the threads.
I hope I have added this time.
Kind regards,
ntn
User | Count |
---|---|
108 | |
12 | |
11 | |
6 | |
5 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.