brian_briones
Participant
0 Kudos

hi Masters.

I've been trying to fix an integration in DEV and QAS but still can not find the problem.

the trx IDX1, IDX2 PI, and trx WE20 and we21 in R3 are well configured.

when looking at the trx sm58 get the following error when I run the IDOC:

the sist.dest. PIPRD is configured with de DEV IP.

and inthe trx sm21 is the following error:

not how to correct these problems. if you have any ideas would be helpful.

regards

Accepted Solutions (1)

Accepted Solutions (1)

Harish
Active Contributor
0 Kudos

Hi Brian,

Please check the authorization of user used in PI RFC destination. from teh error it seems that user does not have proper authorization.

Regards,

Harish

Answers (5)

Answers (5)

Bhargavakrishna
Active Contributor
0 Kudos

Hi,

Try this

http://scn.sap.com/thread/1846681

Did you try Execute LUW option from SM 58?

Regards

Bhargava krishna

Former Member
0 Kudos

Hi

Did you checked the business system created in PI and have the associated the adapter specific identifiers associated to them ?

Go to ID and click on your business system and check for the above it should have the ecc sysid and client details...

HTH

Rajesh

ambrish_mishra
Active Contributor
0 Kudos

Hi Brian,

Do an SLDCHECK in ECC system and test ABAP connection from ECC to PI. It should fix the problem.

Hope it helps!

Ambrish

Former Member
0 Kudos

Hello,

Please refer to note 940313 which described what steps must be

done to avoid the error message.

Kind regards,

Sarah

rodrigoalejandro_pertierr
Active Contributor
0 Kudos

lets take the monster in peaces.

firts all go to SM59, select the R3 conection used to send IDoc to PI and do a test connection, As far as i can see the user or password are wrong.

Regards