Hi all,

During upgrade ERP to EHP6 in last part Checks phase I got this

To perform the manual application-specific post-upgrade steps,

start ASU Toolbox now, to do this,use transaction /ASU/UPGRADE.

For more information, see SAP Note 1000009.

Continue

Cancel

When I run transaction /ASU/UPGRADE: I get this list:

I had treid to check this note from this liste.

Can I just continue or I should checks all this note.

Any advice. Normaly I will just continue without do any thing in this phase. But I am sure this time.

Thanks

Accepted Solutions (1)

Accepted Solutions (1)

sunny_pahuja2
Active Contributor
0 Kudos

Hello,

If you check different steps in /ASU/UPGRADE then many of them are for your information purpose only. So, you can set their status manually in /ASU/UPGRADE to OK. For some of the steps like table COKEY2 should be empty or taking backup of table T512W is necessary to avoid any issue during/after upgrade.

Thanks,

Sunny

Former Member
0 Kudos

Hello,

Thanks for advice,

Yes I can see from this note the must of them are for information.

I will empty the table COKEY2 and continue with upgrade.

Thanks Again.

Former Member
0 Kudos

Hello,

The  empty the table COKEY2

Note 873466 - COKEY2: Program termination due to data inconsistency

I can not use this note

that is  for  upgrading from a release lower than ECC5.0 to ECC6.0.

Thanks again

Former Member
0 Kudos

Hi Reza,

Did you got any dump while performing the activity?

Regards,

Raja. G

Former Member
0 Kudos

Hi Raja.

No I did not.

Thanks

Former Member
0 Kudos

Hi Reza,

Do you have any entries in the COKEY2 table?

Or this note is mentioned in the /ASU/UPGRADE phase?

If it so it is not relevant you can skit and proceed.

Regards,

Raja. G

Former Member
0 Kudos

Hi Raja,

When I run SE11 I can see there are  Entries in the COKEY2 table.

I am in preparation Phase now.

Thanks

karthikeyan_natarajan4
Active Contributor
0 Kudos

Hi Reza,

It's better you carry on with your upgrade process at his point of time.

regards

kartik

sunny_pahuja2
Active Contributor
0 Kudos

As per upgrade guide, have you performed below step ?

With SAP ERP 2004, table COKEY2 has been extended by two fields. As the upgrade does not initialize the fields, you need to run report Z_873466_REPAIR_AFTER_UPGRADE before you perform the upgrade.

For more information, see SAP Note 873466.

Thanks,

Sunny

Former Member
0 Kudos

Hi Kartik,

Thanks Again for alle good advice.

Yes I will do that. I have done this upgrade before without delete COKEY2 table.

I will comeback with resuts..

Thanks

Former Member
0 Kudos

Hi Reza,

Once you are proceed with the step please close the thread as well providing your inputs.

Regards,

Raja. G

Former Member
0 Kudos

Hello,

Thanks alle of you for help.

I am finish with this upgrade.

Reza

Answers (4)

Answers (4)

Former Member
0 Kudos

Hi All,

I also faced a similar issue during upgrade. Some useful findings.

1. Only super user can access this /n/ASU/START

2. All the obligatory executable tasks are automatically performed by the system automatically during upgrade.      SAPADM. Only errors (if any) are to be corrected.

3. Some of the tasks are only to go through some SAP notes as a precaution before upgrade.

4.  Execute all the checks /n/ASU/UPGRADE

5. This surely can be skipped, but not advisable.

regards,

Amit

Former Member
0 Kudos

Hi Reza,

Please check the below link. It might be helpful for you.

http://scn.sap.com/thread/3425632

Regards,

Raja. G

Former Member
0 Kudos

Hi,

Thanks for alle replys,

Strange in last upgrade for another installation I did not run /ASU/UPGRADE. I am finish now.

Can it made some problem with this new upgraded installation?

Thanks

sunny_pahuja2
Active Contributor
0 Kudos

Hello,

Even if you will not perform these activities then it should not create problem in upgrade. But it is always advised to perform these activities to avoid any errors in the future.

Thanks,

Sunny

Former Member
0 Kudos

Hi,

You can check the relevant notes as per your source and target version.

As well you can check with your functional and technical to seek their help to close this issue.

Regards,

Raja. G

Former Member
0 Kudos

Hi,

Thanks for reply,

The most of this note look like just information.

I am applying EHP6 upgrdae,  many of this note is  abou applying t EHP4 upgrade.

Is it nomal to have so many error in this phase. can I do something to find this error before start upgrade?

Thanks

Reza

karthikeyan_natarajan4
Active Contributor
0 Kudos

Hi Reza,

While selecting the target system in MOPZ before upgrade, did you selected any industry specific solutions like ECC_DIMP or is it already activated in your source system. If yes, then have your functional team and analyze the notes mentioned in the above screenshot and do the necessary adjustments as mentioned in the note.

Please go through this note slowly Note 1000009 - ASU Toolbox 2008 which explains the importance of application specific steps before and after upgarde using ASU Toolbox.

regards

kartik

Former Member
0 Kudos

Hi Reza,

All the packages wont be in EHP6 some of the componenets in EHP4 as well.

For those components the mentioned notes will be appicable.

It is so normal to get the errors as per the components installed in your system. So dont worry try to complete with the help from your team.

Regards,

Raja. G

Former Member
0 Kudos

Hi,

Yes it is mandatory.

Regards,