cancel
Showing results for 
Search instead for 
Did you mean: 

Date of last Inspection

former_member385587
Participant
0 Kudos

Hi Experts ,

How to capture the date of last inspection in a batch or in an inspection lot ? There is no re-occurring inspection scenario. A manual inspection lot is created when and where required and the data of last inspection need to be captures.

Accepted Solutions (1)

Accepted Solutions (1)

former_member42743
Active Contributor

I'd suggest using the UD date from the QAVE table. 

You can attach a follow-up action to the UD code that would run after the UD is made.  You'll have to write the FM for the follow-up action.  Have it get the date from the QAVE table.  I would probably put this into one of the extra date fields found on the second tab of the batch record, (MSC2n).  I believe there are 8 extra date fields there.  You can then create a general characteristic LAST_INSPECTION that references the date field you use to hold the date.  Put the LAST_INSPECTION characteristic into the batch classes that you use.

FF

Answers (1)

Answers (1)

former_member242092
Active Participant

Hi,

Please check the table QAMR and QAVE and also check below link, it is useful -

https://scn.sap.com/thread/3290183

Regards,

RP Jaiswal