Hi Experts,

I am trying to send the nonconformance (NC) data from SAP ME to SAP ERP as a quality notification (QN) when a user or a machine logs an NC code. I have gone through the help dods and created catalog,code group and codes and the same passed in the NC code by enabling ERP QN Code checkbox. I have logged NC with that perticular  NC code. Now I got couple of questions here.

     1. where to check in ME, for successful colloboration event triggered by system.

     2. Is the above configuration is enough? am I missing anything? where should I check in ECC QN notification sent from SAP ME.

Regards, Eshwar.

Accepted Solutions (0)

Answers (2)

Answers (2)

williamson
Advisor
Advisor
0 Kudos

Hi,

Use Qm03 to check the confirmation in ERP after it has been sent from SAP ME.

Thanks


steve

0 Kudos

Hi Eshwar,

I would suggest this help and activating Collaboration-related options of SAP ME Logging Configuration (SAP Note 1266339).

Regards,

Sergiy

Former Member
0 Kudos

Hi Sergiy,

Thanks for the reply.

I am following the same help. after doing the configuration in both ERP and ME I am just logging NC code against SFC of Shoporder. After this not sure where to check for successful notification sent.

do I missing any step.document would be more help.

Thanks in advance.


Regards, Eshwar.

0 Kudos

Hi,

You should see it in SAPMEINT Queue Monitor.

Regards,