on 09-27-2013 5:32 AM
Dear Experts
As i installed Solman7.1 and we are stuck in System preparation for CCN Notes I have Implemented Note 1633725 with all manual correction but there is completion id tab Implement sap Note In activity warning and download in activities not yet Performed
Kindly suggest which note are to be implement give us workaround
Hi,
After you implemented the note did you close solman_SETUP and rerun it again.
Once you have downloaded all the note you need to click on Status and then give Performed.
and then launch Post processing and click on execute button.
But you are using SP04 . You should go to SP08 and then do all the steps to avoid many issues.
Thanks
Rishi Abrol
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Rishi Arol
we are on sp04 we are not able to move to sp8 bcaz we don't have Mopz activated bcaz system prepration had some issue with tab 3 implement sap note we had implemented the note 1633725 through snote then also it is not able to activate download tab
is it possible to goto sp8 at at this stage then kindly help in getting that
How to activate Mopz at this stage
Regadrs
Hi,
You dont need to used MOPZ if you want to upgrade to SP08 as sap gives the DVD you can download .
It has the stack file also and use can use an upgrade to SP08 with out configuring MOPZ.
List of DVD.
EXE | 51045452_1 | SAP Solution Manager 7.1 SPS 08 1 of 6 | Info | 976563 | 19.02.2013 | ||
RAR | 51045452_2 | SAP Solution Manager 7.1 SPS 08 2 of 6 | Info | 976563 | 19.02.2013 | ||
RAR | 51045452_3 | SAP Solution Manager 7.1 SPS 08 3 of 6 | Info | 976563 | 19.02.2013 | ||
RAR | 51045452_4 | SAP Solution Manager 7.1 SPS 08 4 of 6 | Info | 976563 | 19.02.2013 | ||
RAR | 51045452_5 | SAP Solution Manager 7.1 SPS 08 5 of 6 | Info | 976563 | 19.02.2013 | ||
RAR | 51045452_6 | SAP Solution Manager 7.1 SPS 08 6 of 6 | Info | 942425 |
Thanks
Rishi Abrol
Dear Rishi Abrol
I had Downloaded SP8 6 DVD's as you said now tell me how to apply them or i need take backup of whole system before going to sp8 all this activities i am doing for first time. If you have send me some link for configure Mopz from scratch.
Kindly send me notes on that so i can go forward looking forward for your reply
Regards
Hi,
Please try to do the patching using the tool SUM tools.
Please read the below link how to run SUM tool.
https://websmp103.sap-ag.de/~sapidb/011000358700000783082011E#q2
This will show you how it runs.
http://scn.sap.com/docs/DOC-25113
Please copy all the patch in the directory at os level.
Copy the Xml file also in there.
Uncar the sum tool and run the upgrade.
Give the stack file in the sum tool when it asks.
Please read the guide and it would be easy after that.
Thanks
Rishi Abrol
Thanks & Regards
Dear Rishi
As we had space issue this activity require 150 as i read in note the space require we manage to get the space in which drive how much space require suggest me
I have uncar them in different folder should i merge them them my xml will generate Kindly suggest Thanks & regards Rajendra |
Dear Abrol
I have downloaded SIX dvd's i unzip all files and kept them in one folder that what from my thought
that is only combine of both called as the stack file and the patch that both are in one directory.
Or any difference files i have to download for patch file
i will send you the attachment document for ur reference
in this following folder i have whole unzip file stored shall i proceed
i am login as ADMINISTRATOR it through error called login as SIDADM
Kindly confirm
Dear Rsihi
I startted the Upgrade process at one stage it ask for
I am getting bit confuding as i installed license by using SLICENCE in ABAP so i have to again apply license for java system also
Kindly clarify i want istall license then let me know the procedure or lonk to follow
looking forward to positive reply
Thanks & Regards
Hi Raj,
If you have implemented all the CCN notes in snote with all the manual corrections, you can manually changes the status to performed in import subtab.
regards
kartik
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Kartik
I has implemented note 1633725 and manually changes the status to performed in import subtab but
there is no result if u have note which subnotes in 1633725 required manual correction bcaz there are number of subnotes in that can you share with us so we can get rid of this as earliest
looking forward for your positive reply
Thanks
Hello
What is the status of the SAP note 1633725 in Tx SNOTE ?
Make sure that note is implemented.
Regards
RB
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Reagan Benjamin
I had Implemented snote 1633725 the status of note is finished it may have some problems if u have any document that which sub note has to implement in which way kindly send me the doucument we are not able to activate Mopz also if u need i can provide u team viewer so that u can able to rectify the same
Thanks & Regards
Dear
I had implemented note 1633725 and manually changes the status to performed in import subtab but
there is no result if u have note which subnotes in 1633725 required manual correction bcaz there are number of subnotes in that can you share with us so we can get rid of this as earliest
looking forward for your positive reply
Thanks
User | Count |
---|---|
87 | |
10 | |
10 | |
9 | |
7 | |
7 | |
6 | |
5 | |
4 | |
4 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.