on 09-26-2013 7:49 PM
Hi,
I am new to SAP MII 14.2. I want to know what version of SAP ECC we should have in order to be able to leverage PIC in MII 14.2.
Thanks in Advance!
Rajesh
Tags were edited by: Michael Appleby
Hi Rajesh,
There is no correlation between ECC and PIC till MII 14.0 SP3.
PIC integration with PP and PM hierarchy would be present from MII 14.0 SP4.
So for SP4 and after,you need to take care of ECC version.
Regards,
Rohit Negi.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Rajesh,
Sorry for the late reply.
Here is the PIC guide:
and MII 14.0 help document:
SAP Library - SAP Manufacturing Integration and Intelligence
Regards,
Rohit Negi.
The PIC integration with ERP is not currently released to the market and is planned to be part of MII 14.0 SP04 which is planned for release on the last week of November 2013. The integration will include the ability to browse and import from PM (Functional Locations, Equipment, Measurement Points) and from PP(-PI) (Work Centers, Capacity IDs) and assign them to various nodes in the PIC. This will allow for a much tighter integration between the tag environment and ERP and is a very much anticipated feature for the MII PIC.
Sam
User | Count |
---|---|
10 | |
5 | |
1 | |
1 | |
1 | |
1 | |
1 | |
1 | |
1 | |
1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.