Standard Process:
Inspection lots are created at the time of goods receipt against the material document no:
If 10 partial GR is done 10 inspection lots will be created parallely
Requirement:
When 10 partial GR for a process order is done only one inspection lot have to be created.
Is there any way be which this can be achived...???
Regards,
Joseph.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Nitin,
I posted the snap from IDES EhP4, it was 'For each order item' for inspection type '04'.
I think you have posted for '01', where it is 'For each purchase order item'. The setting you have mentioned is same that I discussed earlier.
Besides, you do not see the drop down keys like 'X', '1' '2' due to your GUI setting. Change it to:
Best Regards,
Rajen
Hi Joseph,
This can be easily done provided you do not change batch num with each Material document. If you maintain a common batch num for all GRNs then single inspection lot can be generated against Purchasing document/Purchase order.
This setting can be maintained in Material master QM view under the tab Control inslot. Set the indicator to 'for each purchase order, batch and storage location' under the 01 inspection type and save it.
I have given a snap shot for better understating.
Pl check and revert back with results or queries, if any.
Regards,
ntn
Message was edited by: Nitin Jinagal Hi Joseph, I mistakenly took your scenario for Incoming inspection. Pl follow what Rajen has told to generate single insp lot for a process order. Rest of the factors remains unchanged.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
107 | |
12 | |
11 | |
6 | |
5 | |
4 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.