on 09-19-2013 2:22 PM
Hello,
I have installed and configured two Solution Manager 7.1 systems in a two system landscape DEV and PRD.
In PRD system EWA does work, so in SDCCN the corresponding job is listed and also the job Service Preparation Check.
In DEV system EWA does not work although the configuration is the same I think.
As you can see the jobs EWA and Service Preparation Check are missing.
In the configuration of the Solution Manager of DEV you can see that the product is not in solution whereas in PRD the checkbox is activated.
In both systems I have configured the same configuration steps (Basic Configuration, System Preparation, Technical Monitoring, Managed System Configuration).
Can anyone help me?
Thanks.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Veysel,
In same solution add the Dev logical comonent and active the EWA alert.( also check in SDCCN whether SAP EarlyWatch Alert is active in task list, after dev EWA active)
Also check in smsy ->Enviroment ->Solution manager opration -> Administration SDCCN, whetehr DEV system is added.
Once added Maintenance Package is active .
Normally re-execute the Managaed system setup, so it will solve all the issue.
Rg,
karthik
Hello,
thanks for all the tips. I have set "all data" in the data settings and the service is active too.
In SCC4 the DEV system is declared as Customizing and in the solution manager the system role is productive. Should I change the system role to DEV? ANd how can I do that?
Thanks.
Bye
Message was edited by: Veysel Imamoglu
But I am interested to know whether a second solution is needed for the DEV system. I thought that the existing solution is sufficient for the two system landscape. Isn't it???
Hello Veysel,
If you are using two systems solman DEV and solman PRD.
and if you wish to see the same solution in both the systems, then you must perform either way
1. you must configure a SOLUTION in both the systems (or)
2. you must create a SOLUTION in DEV and then transport it to PRD.
second one may be complicated since you donot have a default option to transport the SOLUTION as you have it for ROLES, TABLES, SNOTES & SUPPORT PACKS, etc..
Hope this helps,
Nag.
Hi Karthik,
I cannot change the role. I only can add some more system roles but cannot change the leading role P.
By the way is that necessary to add the SLD of the production system in the SLD of the DEV system?
In the production SLD I have added the SLD of the DEV system. In the past a solution manager expert said that manually changes in SMSY are not recommended, it should be triggered by the SLD ideally.
Regards,
Veysel
User | Count |
---|---|
86 | |
10 | |
10 | |
9 | |
6 | |
6 | |
6 | |
5 | |
4 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.