Gurus,

When i created MIC i selected summarized recording option.While recording results the system is allowing to do single results also.How to prevent from doing single Results Recording.I am using sampling procedure.


Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Dear Sandy,

Kindly check whether you have maintain the below mentioned settings for the control indicators for MIC (QS21)

Former Member
0 Kudos

What happens when i have many MIC in Quality plan,Should every MIC be configured this way?

Answers (3)

Answers (3)

Former Member
0 Kudos

All the changes will be applicable only for new inspection lots if the MIC maintained with appropriate version in Inspection Plans.

Old Inspection lot will not get updated with these changes.

zgius16
Participant
0 Kudos

HI,

check if in control indicator you are setted "Fixed scope" in Inssp.Code.

Gius

Former Member
0 Kudos

One more thing ....to add , do not forget to tick on" Record measured vals"

Former Member
0 Kudos

I have done it but when i try to do RR still it is the same for the lots which has already been created.How to apply dynamically for the old lots?

former_member211618
Contributor
0 Kudos

HI Sandy,

    Please reset the lots by using QAC3 and reassign the plane & do sample calculation by using QA02.

Note:Inspection lot date must be after date of inspection plan created date. 

Former Member
0 Kudos

It should not happen.Please check the version of MIC & exact control indicators of MIC @ Inspection plan.generally when summerize is selected ,system should ask for summerize result.

If possible attach screenshot of RR.