Dear Friends,
Actually i am working in new requirement in QM so any one please guide me
We need to do GRN against PO at that time we can maintain skip inspection lot procedure i.e 1 lot will be inspected and 5 lot's will be skipped and 7 lot will be inspected for this requirement i can maintain
in Material master: Procurement active,Auto UD,Skip allowed
Quality plan:Vendor assignment
Vendor master:Actual qm system assignment
Quality info records:existing qm sys:1299 ISO 9001,Withcert,skip,source inspection:01
Quality level (QDL1):Assignment of DMR
but my problem is while i do the GRN total lot's will be skipping
where can i do the mistake,any one can help me pls it is urgent requirement
if you feel free give mis cal to:09739426554
Thanks,
Krishna.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
Please go through the below thread carefully its close related to ur issue.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
For above said scenario go to DMR and check
Insp stage 1 should be with IST check box selected,
sel line item & sel create stage,assign as below.
If (OK)
No of inspections 1, New inspection stage as 2 .
If (not OK) rejections 1,new insp stage 1.
Insp stage 2(skip)
OK
No of skips 5,Max skip duration 5,new insp stage 1.
Not OK
Rejections 1,new insp stage 1
Assign the DMR in insp plan header screen & select dynamic modification level as lot lvl
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
95 | |
11 | |
11 | |
6 | |
6 | |
4 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.