ues in Heuritics - receipts are not getting generated

Former Member
0 Kudos

We have a SNP heuristics planning run process which runs every night in

the background. The planning results are not correct & receipts are not

generated for some products. Also we see that not all location products

are being selected when the heuristics is run though the selection

profile has all locations despite which the planning run is missed for

some products. As of now the workaround is if we run the product in foreground

(Interactive planning book), then the receipts are getting generated.

As per users observation, this issue is mainly happening for production

plants.

Can any one give us some hints....

Accepted Solutions (1)

Accepted Solutions (1)

former_member187488
Active Contributor
0 Kudos

Hi, it is most probablly that the low level codes are not correctly calculated. Please check the LLCs in /sapapo/rrp_netch first, or better run LLC determination again in /sapapo/snpllc.

Then please apply note 1907530, by which you'll get the location/products being processed, and the sequence of the location products processd if you're not using parallel processin.

Former Member
0 Kudos

Thanks Ada,

Yes, In SCM 7.0 LLC job showing finished successfully. Even though cycle entries existing in spool.

Later we have corrected the wrong cycles. now heuristic is working fine.

One question in SCM5.0 job uses to fail if wrong cycle entries exists. but why SCM 7.0 LLC job showing finished successfully even though cycle entries existing in spool?

former_member187488
Active Contributor
0 Kudos

Hello, I think in standard, LLC determination will not save in case of cycle, but if you implemented BADI /SAPAPO/SNP_LLC method SAVE_WITH_CYCLES, it will save in SNP LLC determination. (In case of PPDS, there's other control on this.)

Answers (1)

Answers (1)

rupesh_brahmankar3
Active Contributor
0 Kudos

Hi Gopala,

Please check the log of background job. In spool you can have the details for materials were planned by the job. Apart from that check the batch job variant for material selection if selection is based on planner then check the planner in properly  maintain in product master MAT1.

Regards,

R.Brahmankar