on 08-21-2013 2:27 AM
During SAP_BASIS Update SAPKB70204 using SPAM - SM50 Shows report SAPLSTPA is On-Hold
SPAM Status DDIC_IMPORT
SM66 analysis shows - Work Process stopped reason CPIC
Job Information
Job name OCS_QUEUE_IMPORT
Scheduled by user BI3ADM
Scheduled by user 20.08.2013 a 15:27:22
Started on 20.08.2013 a 15:27:22
Status Active
Target system OPTIONAL
Executing system Sapsrv1
Job class C
Periodic job No
Delay (sec)
Average run-time (sec)
Last changed on 20.08.2013 a 15:27:22
Changed by BI3ADM
Step list
Report RSSPAM30
SPAM SP Level 7.02/50
Kernel 720 Patch 401
DBSL 720 Patch 327
Oracle 11.2.0.3.0
OS : Windows 2008 R2
tp Version 380.08.41 (n .ow.unkn)
Hi Christopher ,
As you are facing issue with CPIC and most probable reason for this is there is issue with RFC (function call).
Please check log in tmp dir and provide more info about this.
Best Regrads,
Atul
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Christopher,
Please check the details from the ULOG,SLOG and temp log files created under /usr/sap/trans/tmp to know the extact status of the patching.
Alternatively please check whether there is enough free space in oracle database.
Hope this helps.
Regards,
Deepak Kori
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Christopher,
It seems that the system is waiting for R3trans processes over the operating system. You should check the trace files under "/usr/sap/trans/log".
Best regards,
Orkun Gedik
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
101 | |
13 | |
13 | |
11 | |
11 | |
7 | |
6 | |
5 | |
4 | |
4 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.