Multiple schedule lines in Sales order.

former_member857659
Participant
0 Kudos

Dear Gurus,

When ever i am trying to create a sales order with material "A" system is showing two schedule lines in Sales order.

For eg:- I have 10 Qty in Stock for Material "A".

Now let say I have created an order today (29-July-13) for 1 Qty. System is confirming stock on (31-july 13). Even though i have enough stock in hand.

and If i create an order of 11 Qty. Then system is confirming first 10 qty on 31- July- 13 and remaining 1 qty on 6- August-13.

Could anyone tell me how system would be calculation these days. From where it is picked up... I have check in Materail master in MRP tab..no days are maintained.

Regards,

Rikin

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

HI,

Just check out whether you have maintained any of these below:

Total Replenish lead Time days - MRP 3 View

GR Processing time - MRP 2 View

Pick/Pack time - Shipping Point

Loading time - Route

In general Delivery Scheduling takes place on the criteria mentioned above i suppose.

Thanks,

Samba

former_member857659
Participant
0 Kudos

Hi Samba,

Thanks a lot for the information..ya 2 days was maintained in Route..thanks ...

And what about the second one..that  If i create an order of 11 Qty. Then system is confirming first 10 qty on today now and remaining 1 qty which is not  in stock is getting confirmed on 2- August-13...I have check Materail Masters not times are maintained...

Regards,

Rikin

Answers (4)

Answers (4)

balaji_parsewar
Contributor
0 Kudos

HI Rikin,

Apart from above mentioned checks, please check sales document type with VOV8.

Go to required delivery date section & check "Lead Time in days."

@ Sambasiva - pick/pack time & loading time both will come from shipping point.

Regards,

Balaji

former_member857659
Participant
0 Kudos

Dear Balaji..I have checked in VOV8..but no lead times are maintained..

I got the solution for the 1st one..as per Samba's reply..2 days was maintained in Route...now the second one that  If i create an order of 11 Qty. Then system is confirming first 10 qty on today now and remaining 1 qty which is not  in stock is getting confirmed on 2- August-13...I have check Materail Masters not times are maintained...

rupesh_brahmankar3
Active Contributor
0 Kudos

Dear,

Do you have in-house production days, GR Processing time defined in MRP 2 view?

In OVLZ and check in your shipping point whether the Loading time w.days and Pick/pack time.

Do you have Lead time in days for sale order type in VOV8?

Regards,

R.Brahmankar

jignesh_mehta3
Active Contributor
0 Kudos

Hello Rikin,

There can be any one of the multiple reasons behind this 2 days delay in stock confirmations.

Check the following:

1. Open order / Open Deliveries for the material which may be blocking the stock.

2. Factory calendar of Plant, Shipping, Ship to party, if some days are declared holidays, system will not confirm stock on those days.

3. Pick / Pack time / Loading time etc maintained in Customizing.

The list can go on & on...

You will have to explore & come to a conclusion yourself. But first check for any open Order / deliveries for this material.

Thanks,

Jignesh Mehta

Former Member
0 Kudos

Dear Jignesh sir

1. Open order / Open Deliveries for the material which may be blocking the stock

Dear plz explain this

thanks a lot

Former Member
0 Kudos

Based on the description, looks like there is 2 days of lead time maintained for this material as it is not confirmed even when the stock exists..

former_member857659
Participant
0 Kudos

thanks for your quick reply Yathish...I have checked in Material master..no dates are maintained...is there anywhere else..i need to check about the lead time..

Former Member
0 Kudos

Rupesh/Jignesh have provided you those pointers to check..

former_member857659
Participant
0 Kudos

Dear Yatish,

I got the solution for the first one, as it was maintained in Route..

now the second one..that  If i create an order of 11 Qty. Then system is confirming first 10 qty on today now and remaining 1 qty which is not  in stock is getting confirmed on 2- August-13...I have check Materail Masters not times are maintained...