cancel
Showing results for 
Search instead for 
Did you mean: 

SUM SP07 PL-7 , 5.6 Execution, JAVA , STOP_SHD_J2EE phase

christoph_ostrop
Active Contributor
0 Kudos

and the next error:

we did finish phase 5.5 PreProcessing,

then did a whole backup of the system (sap systems are down)

then restart SUM process to continue phase 5.6. Execution,

but

An error has occurred during the execution of the STOP_SHD_J2EE phase.

 

Could not stop AS Java instance with name J2EE and number 17 of the shadow system. Could not execute operating system process for action stop on instance 17. Process ID is 7, process name is sapcontrol. Return code condition success evaluated to false for process sapcontrol for action stop.

You can find more information in the files /usr/sap/EXE/SUM/java/log/STOP_SHD_J2EE_PSJ_02.LOG

normal instance is 10 (SCS10) and 11 (DVEBMGS11)

the shadow instance is 13 (DVEBMGS13)

we are on IBM-i with a double-stack PI (Upgrade from NW-PI-7.00 SP18  to NW-PI-731 SP07

how to reset the sapcontrol file,

there is no SAPSTRSRV with <SID>ADM  running,

Accepted Solutions (1)

Accepted Solutions (1)

bxiv
Active Contributor
0 Kudos

It may be helpful to attach the log file and the trouble ticket.

Also while you may not have a sapstrsrv running, do you have a sapcontrol running?

christoph_ostrop
Active Contributor
0 Kudos

thanks for your reply,

i had already opened a suppport ticket and the issue was solved

by starting the shadow-instances manually,

so i want to close (maybe delete) this discussion,   Thanks.

Answers (0)