on 07-24-2013 6:47 AM
Hi team,
I have created the production order in SAP. The Order status is "REL MANC PCNF PDLV SETC".
With the above status, i am setting the status "TECO" for my prod order. If i set the status 'TECO", what will happen for my component reservations?
After setting the TECO status, my prod order status will be "REL MANC PCNF PDLV TECO SETC". With this status, can i able to settle & close my order?
Is the production order status should be DLV & CNF for settlement & closure even though the order has TECO status?
Thanks
Dear,
Once you set the TECO status to a production order system will activate the deletion flag to the reservation.
Is the production order status should be DLV & CNF for settlement & closure even though the order has TECO status?
For settlement you should have status as TECO or DLV once the order get settled its balance become zero after that you can close the order.
Hope clear to you.
Regards,
R.Brahmankar
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,Selva:
With the above status, i am setting the status "TECO" for my prod order. If i set the status 'TECO", what will happen for my component reservations?
reservation will be cleaned..you won't see those component reservation in SAP
After setting the TECO status, my prod order status will be "REL MANC PCNF PDLV TECO SETC". With this status, can i able to settle & close my order?
Yes..you can settle &close order in status of TECO or DLV &CNF ,
Is the production order status should be DLV & CNF for settlement & closure even though the order has TECO status?
No. TECO means no need to process the order (no production need to be carried out)
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Selva,
I am just adding some point
TECO:
The following actions are executed if an order is set to Technically complete.
After technical completion you can still make postings for the order. For instance, material withdrawal or a confirmation can be posted if they were previously forgotten.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hello Selva,
With the above status, i am setting the status "TECO" for my prod order. If i set the status 'TECO", what will happen for my component reservations?
Reservations/Capacity Requirements will be deleted and loose MRP relevance.
With this status, can i able to settle & close my order?
yes you can settle and close.But for CLSD,order balance must be 0 and if you dont have pdlv or dlv than how balance would be 0?
Status CLSD:
Prerequisite-
Result:
Status TECO:
Prerequisite-
Result:
Regards,
Message was edited by: dee joy
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Dee Joy,
My prod order status is be "REL MANC PCNF PDLV TECO SETC"
SETC: Settlement Rule Created
MANC: Material Availability NOT checked.
So, i hope that with the status "REL MANC PCNF PDLV TECO SETC", i can able to settle the production order. And I am also assuming that if the production order is settled properly means the ORDER BALANCE IS ZERO. Then i can able to close the order.
In which transaction i can find the order balance for the production order?
Is the production order settlement & closure (in SAP) responsibility of production (shop floor) team or finance & controlling team?
Thanks