I've been reading that the option of installing in the same sid all the components of SAP Process Orchestration (PI,BPM.BRM) is only possible in java only installation.

http://scn.sap.com/community/process-orchestration/blog/2012/05/31/download-and-installation-of-proc...

Is this afirmation still valid or nowadays exists the possibility of deploying BPM, BRM and PI dual-stack in the same SID?

Thanks a lot.

Regards.

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Hi Christian.

It's not possible. You are right saying to use the same SID you should have PO (BRM+BPM+PI) java only. If you want the dual PI stack, you will need to have BRM/BPM in one SID and the PI dual stack in another SID.