on 07-18-2013 6:05 AM
Hi everybody this is my situation
I have installed an ERP 6.0 EHP6 with SPS07
I installed Baseline package for Mexico over this SPS
Baseline guide says that SPS MUST be SPS03 because lower or higher versions can cause trouble
I'm getting troubles with building block activation because of SPS (at least that is my assumption)
I don't want to uninstall this ERP instance, instead of I want to install another ERP instance -> install SPS03 -> install and configure Baseline ->install SPS 07 -> make a remote client copy from this second instance to my first instance (using SAP_CUST or SAP_ALL profile through SCC8)
Do you think that this solution can work?
thanks in advance
Hi,
Client copy is always suggested between system that have same patch level.
I would suggest you to install another ERP instance -> install SPS03 -> install and configure Baseline ->install SPS 07 -> and then do system copy.
Better would be install SPS03 -> take backup ->install and configure Baseline ->install SPS 07 -> and then do system copy.
People might say you can do client export or import but i think that still can cause issues.
Thanks
Rishi Abrol
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
98 | |
11 | |
11 | |
10 | |
10 | |
8 | |
6 | |
5 | |
4 | |
4 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.