cancel
Showing results for 
Search instead for 
Did you mean: 

Duplicity batch quality control 08.

Former Member
0 Kudos

Hello, good afternoon gentlemen,

I have a problem in a lot of quality control type 08. The plot was generated and do not know how, it was associated with two lots of material, however after UD, lots of these stuck in quality stock and I can not move it for free use.

  Has anyone gone through a similar situation?

Sincerely,

Alvaro.

Accepted Solutions (0)

Answers (2)

Answers (2)

former_member184536
Active Contributor
0 Kudos

Hi

More information required.

regards

Manish

Former Member
0 Kudos

Requirement is not so clear,

What is system status of 2 IL's?