Hi SAP Gurus,

I want know what is configuration settings for batch management from MM and PP side?

I want goods issue in FIFO manner as per SLED of material in MB1A -261?

What should be the configuration setting for it?

Accepted Solutions (1)

Accepted Solutions (1)

bisweswar_sahu
Active Participant
0 Kudos

Hi ,

Please proceed as given bellow.

Prerequisite:

1. Material Should be Batch Managed(View:Purchase) & SLED maintained (View:PlantData/Stor.1).

2. Search Procedure(ME0001) assigned on MovType:261(Check TCode: OMCG)

Config:

1. Create Class(Type: 023) & assign SLED characteristic(LOBM-VFDAT)

2. Assign the same class in MM.(View: Classification)

3. Creation of a Sort Rule/Sequence(CU70)

   i: Assign the characteristic LOBM-VFDAT.

  ii: Mark as Ascending

4. Creation of Batch Search Strategy(MBC1)

   i: Select Strategy type: ME01(MovType/Plnt/MatlNo.)

  ii: Choose Key: MovType & Plant (Can select alternative combination as per required)

iii: Give MovType: 261, Plant: <As required>

  iv: Select the line item, Click Selection criteria & assign the designed class as designed in config step-1.

   v: Select the line item, Click Sort & assign the sort rule as designed in config step-3.

  Save & Back.

Transaction/Test:

1. Do GR with different Manuf.Dates.

   Note: As soon as the date of manufacture is entered, the system automatically calculates the Shelf Life

Exp. Date. (Check details in MSC3N)

2. During issue using 261, Give * in Batch, it'll choose Batch(s) as per SLED.

Bisweswar

Answers (2)

Answers (2)

Former Member
0 Kudos

Batch management is different from batch determination.

First, you should check if your materials are properly batch managed (in material master and SPRO settings).

Then you can activate batch determination using steps given by users above.

Former Member
0 Kudos

Hi Priti,

It is required lot of set up both in production order parameters and Batch Management .I am providing you a summery of it .

Configuration Required for your above issue are as follows :

1.Activated Batch Management in the Material Master-MRP2 view and Work Scheduling view of the FG

2.check material master MM02, tab MRP2 and set field "Batch Entry" to value 3 here

4.You maintain a Search Procedure in OPL8 - Order Type Dependent parameters .Before that you should have Batch serach strategy :The sequence of steps are as follows -

Create Condition Tables

Create Access Sequences

Create Strategy Types

Batch Search procedure definition

Batch Search procedure allocation and check activation

Define Selection classes

Define sort rules

Maintain Batch Allocation Strategy Number Ranges

All the above are available in the Path - SPRO --->Logistics-General ---> Batch Management ---> Batch Determination and Batch Check

5.Maintain the setting in T.code OPKP (production scheduling profile). Select automatic batch creation on order creation.

6.If u want to execute the batch determination for components in the component overview of production order , then u have to create batch search strategy at COB1

7.If u want to execute during order confirmation u have to create batch search strategy at MBC1.

Refer the below link for your farther reference :

http://scn.sap.com/thread/2105436

http://help.sap.com/saphelp_47x200/helpdata/en/25/28428b4f7811d18a150000e816ae6e/frameset.htm

Hope this will be useful

Regards

Kiran