Hi SAP Gurus,
I want know what is configuration settings for batch management from MM and PP side?
I want goods issue in FIFO manner as per SLED of material in MB1A -261?
What should be the configuration setting for it?
Hi ,
Please proceed as given bellow.
Prerequisite:
1. Material Should be Batch Managed(View:Purchase) & SLED maintained (View:PlantData/Stor.1).
2. Search Procedure(ME0001) assigned on MovType:261(Check TCode: OMCG)
Config:
1. Create Class(Type: 023) & assign SLED characteristic(LOBM-VFDAT)
2. Assign the same class in MM.(View: Classification)
3. Creation of a Sort Rule/Sequence(CU70)
i: Assign the characteristic LOBM-VFDAT.
ii: Mark as Ascending
4. Creation of Batch Search Strategy(MBC1)
i: Select Strategy type: ME01(MovType/Plnt/MatlNo.)
ii: Choose Key: MovType & Plant (Can select alternative combination as per required)
iii: Give MovType: 261, Plant: <As required>
iv: Select the line item, Click Selection criteria & assign the designed class as designed in config step-1.
v: Select the line item, Click Sort & assign the sort rule as designed in config step-3.
Save & Back.
Transaction/Test:
1. Do GR with different Manuf.Dates.
Note: As soon as the date of manufacture is entered, the system automatically calculates the Shelf Life
Exp. Date. (Check details in MSC3N)
2. During issue using 261, Give * in Batch, it'll choose Batch(s) as per SLED.
Bisweswar
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Batch management is different from batch determination.
First, you should check if your materials are properly batch managed (in material master and SPRO settings).
Then you can activate batch determination using steps given by users above.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Priti,
It is required lot of set up both in production order parameters and Batch Management .I am providing you a summery of it .
Configuration Required for your above issue are as follows :
1.Activated Batch Management in the Material Master-MRP2 view and Work Scheduling view of the FG
2.check material master MM02, tab MRP2 and set field "Batch Entry" to value 3 here
4.You maintain a Search Procedure in OPL8 - Order Type Dependent parameters .Before that you should have Batch serach strategy :The sequence of steps are as follows -
Create Condition Tables
Create Access Sequences
Create Strategy Types
Batch Search procedure definition
Batch Search procedure allocation and check activation
Define Selection classes
Define sort rules
Maintain Batch Allocation Strategy Number Ranges
All the above are available in the Path - SPRO --->Logistics-General ---> Batch Management ---> Batch Determination and Batch Check
5.Maintain the setting in T.code OPKP (production scheduling profile). Select automatic batch creation on order creation.
6.If u want to execute the batch determination for components in the component overview of production order , then u have to create batch search strategy at COB1
7.If u want to execute during order confirmation u have to create batch search strategy at MBC1.
Refer the below link for your farther reference :
http://scn.sap.com/thread/2105436
http://help.sap.com/saphelp_47x200/helpdata/en/25/28428b4f7811d18a150000e816ae6e/frameset.htm
Hope this will be useful
Regards
Kiran
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
108 | |
12 | |
11 | |
6 | |
5 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.