on 07-15-2013 1:39 PM
Hello Gurus,
Our company is planning an Upgrade to ECC 6.0 EHP 6. As a BW/BOBJ administrator I have to take care about the impact in BW and BO.
Are there a document with a check list of activities to do before and after this upgrade, What I have to check in BW site to ensure the correct functioning of BW.
Additional Info.
BW Version. 730
Thank you for your help.
Jose
Hello
There is nothing to be done from the BI/BW side.
The upgrade done on the ECC system is not depending on the BW system.
BW systems are connected to the ECC and other systems through RFC and they are mentioned as source systems in the Tx RSA1.
There is nothing to be done from the BI end during an ECC upgrade.
Regards
RB
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
I am also facing this same issue but it reverse.
Recently i have upgraded the BW DEV 7.31 in our landscape and ECC ehp4 also running in my landscape.
If any compatibility is present in the both system.
Even i have checked in uda and PAM also i can not able to find the solution for the same.
Regards,
Kalimuthu
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Dear Mr. Jose.
You should clear the delta queue before upgrade.The important thing is connection between your BW and ECC system. You may be required to replicate all the datasource in your BW side after upgrade. Take care of logistic delta these are very critical. If SID of the system is same then there wont be many issues.
Regards,
Anand Mehrotra.
Sorry for the late answer.
Thank you for your replies.
I search further more in the scn, and I found a nice Wiki about this topic.
http://wiki.sdn.sap.com/wiki/display/BOBJ/SAP+ECC+Systems+SP+Upgrade+and+Impact+on+SAP+BI
This link help me a lot with the check list of actvivities to do when an upgrade is perform in the ERP source system of BW.
Thank you.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Jose,
In general BW is connected via RFC. This is a basic and release independent protocol that will still work after the ECC upgrade.
In general I suggest that you perform a BW load and delta load before you upgrade the ECC (so that the queues in ECC are empty).
Best regards, Marco
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hello,
first of all you can check it via the upgrade dependency analyzer.
Have a look here: http://service.sap.com/uda
Regards,
Bernd
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
85 | |
10 | |
10 | |
9 | |
6 | |
6 | |
6 | |
5 | |
4 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.