cancel
Showing results for 
Search instead for 
Did you mean: 

Synchronzing single SLDs

Former Member
0 Kudos

We plan to use Solution Manager 4.0 as our main SLD (it is configured for that now). As it stands, only Enterprise Portal was pointed to this SLD during installation. We have other systems (XI/PI 7.0 and BI 7.03) that have been configured with their own local SLDs. I have found this note (which is not current in English and is for NetWeaver 2004) that refers to how to synchronize the local SLDs with the central SLD, 764393 Configuration of the SAP System Landscape Directory.

This note discusses an export/import technique. I have found nothing on service.sap.com/sld or elsewhere. Does anyone know how to handle this situation?

Points awarded. Thanks!

Accepted Solutions (1)

Accepted Solutions (1)

DoloresCorrea
Product and Topic Expert
Product and Topic Expert
0 Kudos

Hello Thomas,

Nota 764393 is already in English.

Pleae read the SLD Planning Guide PDF from www.service.sap.com/sld > Media Library, there you can see how to export and import the different contents of SLD.

Also checks notes:

935474 -Grouping SLD instances

954820 - Compatibility of SLD in the system landscape

764393 - Reduce the number of System Landscape Directories

Hope this helps,

Dolores

Answers (0)