Hello everybody,

Do you know how can i activate the creation of change documents when inspection Lot changes this status.

Accepted Solutions (0)

Answers (2)

Answers (2)

Martin_H
Contributor
0 Kudos

In addition to Maheswaran, you might want to set the "RR change docs" indicator in your inspection characteristics. If the processsing of the characteristic is completed and the status changes (status 5), you should also get (additional) change documents.

Regards

MH

Former Member
0 Kudos

Select the Documentation Required indicator in Material Master under QM view.

former_member321932
Participant
0 Kudos

I need to activate the change documents in Inspection Lot created from PM/QM.

Former Member
0 Kudos

Have you tried the above options given?? What was the result??