on 07-03-2013 2:27 PM
Hi Folks,
I want to manage two different items (stockable & Non stockable) in sales cycle.
For example: one sales order created with above mentioned two different items, then how the sub sequent transactions created.
If I am not wrong non stock item would not have delivery process where as stockable iteam can be delivered. In this case how can
we manage these two different items?
Thanks in advance,
SAI
Hi,
I just want to add One point to the option proposed by Santosh, Moazzam & Raj that you have to set up the Copy control for both the Item Cat. "TAX" will be order related billing (VTFA) and "TAN" will be delivery related billing (VTFL).
Also as per Moazzam Order to Delivery TAX + TAN then to Billing TAX + TAN, possible by copy control.
Thanks,
Suman$
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi
It depends on your requirement that what you want. If you want both materials in delivery and billing then this is possible but for non stock item will be just for text purpose. There will be no 601 movement type against this. These are controlled with item category and schedule line category settings. If you want to bring it directly in billing then this is again possible. So it better to explain the requirement and process yu are going to do.
Thank$
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
Non stock item
1. In the Material master, Item category group will be NLAG
2. it will use External Procurement type F in MRP2 view
3. MRP type will be ND ( no planning)
4. Item category from SD point of view is TAX
5. No availability check in Material master
6. Requirement type and schedule lines are not enabled with Availability
Stock item
1. Item category in material master could be NORM
2. Procurement type X is used under MRP2 view
3. MRP type is PD
4. Item category from SD point of view will be TAN
5. Availability check is enabled
6. Schedule lines and requirement class are enable with Availability and TOR
hope it is clear
regards,
santosh
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
You can Control through Schedule Line Category,these control the Availablity check along with Requirement type and Class.
Shiva
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Sai,
Yes, it is very much possible with the help of the item categories.
MATERIAL 1: One a Dummy material (No Stock) - Item Category with Billing Relevance as "I" and the item category will not have delivery possible.
MATERIAL 2: Physical product (With Stock) - Item Category with Billing Relevance as "A" and the item category will have delivery possible.
Please refer to the below thread:
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
103 | |
12 | |
11 | |
6 | |
5 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.