on 06-28-2013 4:37 PM
Hi,
I am trying to make a 2-step transfer between two storage locations within the same Plant.
Storage location A (non WM managed) to storage location B (WM managed)
I've done the required config in OMLR to pop up LT06 after mvmt
*** | 315 | 312 | X | X | DIG |
Which means that after 313 mvt that issues the material from storage location A, I'll make mvt 315 to receive the material in storage location B. After 315 mvt it should pop up LT06 to create transfer order, but it doesn't, it just creates the transfer requirement.
Can anybody help on this?
Thanks in advance
OMLR has the WM reference movement type (315) and the WM movement type (312)
if SAP does not do what is customized here, then I would say it just had not read this customizing.
Go into IMG > LE > WM > Interfaces > Inventory management > define movement types
And check which WM movement type reference is assigned to your 315 IM movement type.
In my system IM 315 is assigned to WM ref 312
If that is the case in your system too, then you made the setting at the wrong movement in OMLR
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Is this *** your warehouse number, or do you find another entry with your real warehouse number that my be setup differently?
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
110 | |
12 | |
11 | |
6 | |
5 | |
4 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.