on 06-24-2013 3:22 PM
Hi Experts,
I need to know what all the preproduction jobs and configuration details in SAP PI 7.3 to be done before going live
For Ex:
Please do add if i missed any other configuration that needs to be placed.Do let us know what are the task need to be carried out by BASIS
Thanks for your help
Regards,
Dinesh
Dear Dinesh,
if you are at dual stack you can go through below link.
http://help.sap.com/saphelp_nw73ehp1/helpdata/en/48/aeb19e5bb5356be10000000a421937/content.htm
Please do add if i missed any other configuration that needs to be placed.Do let us know what are the task need to be carried out by BASIS
you might have tested all your interfaces in your DEV,QA systems with these jobs.
if you don't get any issues you can go ahead with GO live.
after go live basis will get Go Live Analysis report from SAP.
from that report you can find out how many jobs you(or basis) have to schedule.
Regards,
Muniyappan.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
This message was moderated.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
93 | |
11 | |
10 | |
9 | |
9 | |
7 | |
6 | |
5 | |
4 | |
4 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.