Object List - Maintenance Scheduling Overview and Simulation Report

Former Member
0 Kudos

In Plant Maintenance ECC 6.0 EHP 5 version, IP19 Standard Report, can any one explain the Fields with object list and options, with or with out, with and with out and how each option differs in the report

Accepted Solutions (0)

Answers (2)

Answers (2)

former_member187991
Active Contributor
0 Kudos

hi

you can simulate and check if you have specified the equipment Y in object list and Equipment X in maintenance plan, then you can input Equipment Y in the selection screen and select with object list button and execute . it will display the maintenance plan created for X

but the with or without or with/without i am not able to understand properly

Regards

Thyagarajan

Former Member
0 Kudos

First with or without option is for settlement rule. You have the option to create settlement rule in Maintenance plan so that will be copied to PM Order. Based on the settlement rule availability, you can have the list of maintenance plans.

Object list tick box is of no use, that specific should be hidden in the screen.

Very long back, some discussion happened & I remember that particular tick box is obsolete. Please check in forum for the previous threads.