Hi
I am working on CRM 7.0. I have configured dynamic work pprocess. Here is profile parameter I have configure.
rdisp/wp_max_no = 24
rdisp/wp_no_dia = 14
rdisp/wp_no_btc = 2
rdisp/wp_no_enq =1
rdisp/wp_no_vb = 1
rdisp/wp_no_vb2 =1
rdisp/wp_no_spo = 1
rdisp/dynamic_wp_check =TRUE
rdisp/wp_no_restricted =2
In SM50 I can see Dynamioc workprocess =4 .
But when I am trying to test running 3 background job that time 2 background job run I is still active. That means Dynamic work processes not working.
Any idea where I am missing?
Thanks
Sritapa
Hi Sritapa,
Please check below link and sap note
SAP Note No. 1636252 point 5.6
5.6 Dynamic work processes
Best Regards,
Atul
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Sritapa,
Please refer thread http://scn.sap.com/thread/3181212 as well as the SAP help links described in this thread.
Dynamic work process allocation is a feature from NW 7.3 . You have CRM 7.0 which is not based on NW 7.3. Hence this functionality is not available in your system.
Hope this helps.
Regards,
Deepak Kori
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
84 | |
10 | |
10 | |
10 | |
7 | |
6 | |
6 | |
5 | |
4 | |
4 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.