Hi All,

Just want to check if modifying a  mitigation control is possible once it is assigned to any risk?

I have noticed that  only below mentioned details can be modified:

1. Valid From

2. Valid To

3. Status

4. Monitor (drop down)

However, I cant add/remove already assigned systems! The only way I found is to delete it and again mitigate the risk id with appropriate details required.

My question is: Is it not possible to change systems for an existing mitigation control?

Regards

Accepted Solutions (1)

Accepted Solutions (1)

alessandr0
Active Contributor
0 Kudos

Hi Faisal,

a good and easy way to change existing mitigations is to use an ABAP program for down- and upload.

Go to SA38 and use the following programs:

GRAC_UPLOAD_MIT_ASSIGNMENTS

GRAC_DOWNLOAD_MIT_ASSIGNMENTS

Once you have downloaded the full list into an Excel file you can do your adjustments and upload it again.

I hope this helps.

Regards,

Alessandro

Answers (1)

Answers (1)

Former Member
0 Kudos

Hi Faisal,

Yes . It is possible to change systems for an existing mitigation control.

Regards,

Neha

former_member184114
Active Contributor
0 Kudos

Neha,

Thanks for your reply.

May I know how?

Regards,

Faisal