PPM/PDS not apearing in APO after cif

Former Member
0 Kudos

Dear Guru,

I have created few master data like material,location,resource,BOM (not a phantom one) ,Master recipe. I am able to cif all master to APO except master recipe.

All masters are are appearing in APO. I tried with both as PPM and PDS to cif, but i can not see it in APO.

I checked the Master recipe in ECC and itis showing no error. During CIF also there is no error appearing in both ECC(CFG1) and APO(SLG1), CQ monitor.

My Master recipe (MR) contains one operation and one phase.

I have done some general check:

1.Active integration model for product,location ,and Bom,recipe - all IM are active.

2.Validity of Recipe - up to year 2099

3.Machine time is maintained in recipe.

4. Control key in resource contains scheduling.

5.I have used only machine capacity i.e.008.

6.capacity formula and scheduling formula are both same.

7.BOM is active.

Note: My resource is a single mixed resource.

Guys, i am creating the Master recipe for the 1st time. Basically do not have enough idea on process industry.

Is there any configuration setting exist for PPM/PDS in APO or ECC system. which is missing in my case.

What are the other reason which can be in this case.

Thanx & regards

Kishor

Accepted Solutions (0)

Answers (3)

Answers (3)

Former Member
0 Kudos

Hi Kishor,

I believe that the machine time should be maintained in H, in order to be visible in APO. I have experienced that if we maintain std value keys in min, it doesn't give results.

Please correct me if i am wrong.

thansk and regards,

Shweta

Former Member
0 Kudos

Dear Shweta,

Thnks for your reply. This issue has already been resolved.

It does not matter...You can maintain machine time in min.

regards

Kishor

Former Member
0 Kudos

Try SAP006 on the Capacity Tab in "Processing formula" and SAP002 on the Scheduling tab in "Processing formula".  The machine time should be in the second standard value in the routing.

Make sure you have created a production version in the MRP4 view of the material master or with TA C223.  Regenerate your IM and re-transfer.

Thanks

Prashanth

thamizhchelvan_gunasekara
Active Participant
0 Kudos

Hi Kishore,

Pl check the resource consumption, if the consumption is less than 0.1 than the recipe will not be transferred to APO as PPM/PDS.

BR
Thamizh

Former Member
0 Kudos

Hi Thamizh,

Resource capacity formula is Machine * Operation quantity / Base quantity.

Machine time in recipe is 100 min , operation time  is 1000 ea, Base quantity is 1000 ea.

Still then i am not able to cif the recipe.

Can u please suggest any other issue to be checked.

regards

Kishor

Former Member
0 Kudos

Hi Kishor,

Let's try the basics.

Try standard value key SAP1.

Try SAP006 on the Capacity Tab in "Processing formula" and SAP002 on the Scheduling tab in "Processing formula".  The machine time should be in the second standard value in the routing.

Make sure you have created a production version in the MRP4 view of the material master or with TA C223.  Regenerate your IM and re-transfer.

Do you have any other filters in your CIF IM?

Best Regards,

Mike

Former Member
0 Kudos

Hi Mike,

I have already solved the issue...This issue was with standard value key...

regards

Kishor

former_member566355
Participant
0 Kudos

Hi Kishor,

I am also facing the same issue. How have you resolved it ?

Regards,

RS

Former Member
0 Kudos

Hi RS,

Can you please elaborate your issue.

regards

kishor

Former Member
0 Kudos

Hi Kishor,

Check that your control keys have both scheduling and capacity requirements checked.  What are your scheduling and capacity formulas?   Check your resource formulas with the built-in calculator.

How is your integration model set up for the PDS? 

Best Regards,

Mike

Former Member
0 Kudos

Hi Mike,

1. The control key contains both scheduling and capacity requirement,

2. The scheduling and capacity formula are the SAP standard formula ( SAP002 = Machine * Operation     quantity / Base

    Machine time = 100min

     Operation qnty = 1EA

     Base qnty = 1EA

3. Resource capacity formula is same as scheduling.It is maintained as other formula in both case.

4. PDS integration model contains product, location as filter.

Please suggest in case any other issue is there.

regards

Kishor