on 05-28-2013 8:08 PM
Dear ALL,
We are on SRM 7.02 and Ecc6.0 Ehp4.
Please let us know the standard SAP behaviour on attachment transfer for the below scenarion:
Please confirm if the below scenarios are possible without DMS system in place.
Thanks and Best Regards,
Jay
Hi Jay,
To answer your questions;
1) Attachment from PR to SC in PDP scenario it is possible.Please refer threads below that explain how you could achieve this. http://scn.sap.com/thread/3143567 also check http://scn.sap.com/thread/1820918
2) Attachment from SC to PR/PO. This is also feasible. Similar to above thread where DMS settings mentioned you have to perform that and after that in BADI's "BBP_CREATE_BE_RQ_NEW" for PR and "BBP_CREATE_BE_PO_NEW" for PO method FILL_INTERFACE1 you have to put logic to pass the details of Shopping cart attachment into ECC at DMS settings you have performed.
3) Confirmation attachment: I highly doubt it is possible but you could try the same way as point 2 via BADI.
Thank you
Ritesh
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.