Former Member
0 Kudos

Hi,

I have been trying the option of automatic creation of PS Project on saving a portfolio Item. Projects and Item are getting created successfully. But I have the a short dump. And Item have no link to PS Project.

 

How do I configure to connect the PS to PPM?

 

We have SAP PPM5.0 and ECC6.0 at one system.

 

Regards,

Karm

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Hi,

The solution in this thread https://scn.sap.com/thread/3363278

thanks Zhenbo Wang

Regards,

Karm