on 05-14-2013 1:03 PM
Hi ,
Assigned sampling scheme in inspection plan is as follows, but by default the inspection lot taken the sampling size 6 irrespective of sampling procedure assigned for that material.
Lot size | sampling Size |
50 | 3 |
100 | 5 |
500 | 10 |
2000 | 20 |
500000 | 40 |
please clarify,
Regards, Meena.
In this above material inspection plan, User have assigned different vendor (say some 100) under material assignment but inspection lot created for the same material in warded from different vendor ( say some 200) in this scenario have doubt that,
1. How inspection lot automatically taken the group-group counter assigned for some other vendor.
2. How the sampling size calculated as 6 irrespective of the sampling procedure assigned in plan?
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
How inspection lot automatically taken the group-group counter assigned for some other vendor.
When an inspection lot is created, the system calls the task list for inspecting a material that corresponds most closely to the material/task list allocation. The following hierarchy applies:
How the sampling size calculated as 6 irrespective of the sampling procedure assigned in plan?
Refer help.sap.com > calculating the sample size
http://help.sap.com/saphelp_erp60_sp/helpdata/en/2d/351a0c448c11d189420000e829fbbd/content.htm
Regards, DoWook KIM
Thank you... got ur answer for the first one., but in case of 2nd point i am not mentioning that sample size of inspection lot . assigned only one characteristics with above sampling procedure, with respect to sampling procedure, sampling size for that characteristic is 20 but system calculates as 6.
Hi, sampling size calculation is correct for other materials inspection plan assigned with this sampling scheme. This particular material only problem. No sampling procedure assigned in material master also.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
1. Assigned sampling procedure using sampling type 300 only
2. yes the inspection plan group / group counter assigned correctly in the inspection lot.
Thanks., Meena
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
Pls. refer links as-
http://help.sap.com/saphelp_erp60_sp/helpdata/en/2d/352098448c11d189420000e829fbbd/content.htm
http://help.sap.com/saphelp_erp60_sp/helpdata/en/2d/3520a5448c11d189420000e829fbbd/content.htm
Pls.revert if useful.
Regards,
Milind
Please check first in your inspection lot details if the inspection plan and the sampling procedure/sampling scheme have been pulled correctly. It should be visible there how your lot has been calculated.
Regards
MH
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
Pls make sure that you are using Sample type '300' i.e. using sampling scheme.
Revert if it works.
Regards,
Milind
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
108 | |
12 | |
11 | |
6 | |
5 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.