on 05-14-2013 5:24 AM
Hi,
Im facing some problems trying to make stability studies work (first time).
Id arrived to the "complete test scheduling" part there the "The testing schedule is incomplete" error message appears (QST043).
Maintenance strategy is the standard "QSTABI" and I entering a scheduling period of 10 days.
Also in IP02 the error message "No inspection plan found for selection criteria" (QST074).
Could some tell me detail steps to complete the test scheduling part of the study ?
Thanks,
Hi,
Generally QSTABI is designed for 1,2 3 .... months.
Days scheduling is not supported by QSTABI. If you want to use days then you have to create a new strategy.
CSN
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
After Creating Schedule you have to click "Edit Testing Schedule" (or you can complete this step by IP02) and there you have to assign inspection plan to the maintenance Item i.e actually your storage location.
Make sure that you have assigned the strategy QSTABI to your inspection plan Header & Item by using T-code CWBQM. If you haven't assign strategy then you cannot find inspection plan in IP02.
Regards
Hi Diego,
You have skipped one more step, Enter Tcode CWBQM -> Q_OPR_000000000010 -> Enter group group counter combination -> then select the operation line Goto -> Tasklists at the top -> maintenance packages -> then enter the package beside the strategy assigned & save.
Now you assign the same group & group counter in IP02.
This would resolve your issue.
Regards,
Shravan
Dear Diego
1. First create the strategy whose period valued must be in days as per you requirement with IP11
2. Create inspection plan by CWBQM engineering workbench with that strategy.
then do you rest of activities.
regards
Manish
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hello and thank you to everybody who answered, as I was also having the problem of "where do I assign the strategy to the Plan".
For anybody who's getting lost in CWBQM: choose whether to work with Ops or Chars, then click on the button which says "Navigator", use the Navigator on the left to access the Header. The Strategy is under the second tab, you'll need to click on "Modify" before you can update it.
Then go to the menu Task Lists / Maintenance Packages, and indicate for each Operation in your Plan, which Packages in the Strategy should call it.
Once you've done all that, you can now finally update the Calendar for your Stability Study, indicating the Inspection Plan.
(This information is posted above, but I've compiled it and given a bit more detail).