on 05-13-2013 6:58 AM
Dear Team,
In standard, a request will flow from DEVELOPMENT ---> QUALITY ----> PRODUCTION
I have one more production server for testing. My question is that, is it possible a request transfer from quality to two different production server and if yes then how is configure?
Like as below:-
a request will flow from DEVELOPMENT ---> QUALITY ----> PRODUCTION ONE and PRODUCTION TWO
Regards,
Ajay Asawa
Thanks RB and Marius,
I have one more production server because of one financial project is going on.
Anyway i will check your provided links and update you.
Regards,
Ajay
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
In your scenario you can select Multiple level Delivery routes
1. Transport domain you need the authorization S_CTS_CONFIG in the profile S_A.System
follow the link with mulitple system configuration
http://help.sap.com/saphelp_nw04/helpdata/en/1b/9dc2d6e59911d184810000e8a57770/content.htm
Kind Regards,
Balaji G
Hello
But i want to fore landscape system, is it possible?
If your question is to create a FOUR system landscape, then it is possible.
Its is also possible to configure the transport according to the screen shot you have provided.
But the PRD (Live Server) and PRD (Temporary Server) cannot have the same SID in that domain.
Cheers
RB
Hi Ajay
hope these helps
https://scn.sap.com/message/5160043
http://scn.sap.com/thread/808908
Best Regards
Marius
Hello
I have one more production server for testing
Nobody uses a production system for testing purposes.
My question is that, is it possible a request transfer from quality to two different production server and if yes then how is configure?
Check these links:
http://help.sap.com/saphelp_nw04/helpdata/en/57/38de0c4eb711d182bf0000e829fbfe/content.htm
http://help.sap.com/saphelp_40b/helpdata/EN/57/38de8e4eb711d182bf0000e829fbfe/content.htm
Cheers
RB
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
I have checked links which you have provided. It’s very helpful. But I did not get my solution. I will explain:-
Currently have 3-system landscape DEV/QAS/PRD (ERP 6.0/HP Unix/Oracle).
There is a new major development project going on quality server and we want to transfer new request related to this new project directly QAS to new temporary PRD ( TESTING SEVER) and other request exclude than this project is transfer from QAS to our live PRD server as regular.
Is it possible to have request parallel transfer from QAS to PRD (live server) and PRD (temporary server) at same time? Like below:-
So I need to know how to plan our system landscape for the scenario.
Thanks.
Ajay Asawa
Hi Ajay,
you will need to use GROUPS as this will allow you to transfer to both PRD server at the same time
review the link below shows how to create groups
http://www.scribd.com/doc/138217537/Basis-Stms-Configuration-Notes
best regards
marius
Hi Aja<
yes it is possible and more,
please have a look at the links below
http://scn.sap.com/thread/1751528
http://sap.ittoolbox.com/groups/technical-functional/sap-basis/4-system-landscape-stms-2712918
Best Regards
Marius
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hello Ajay,
I have seen several parallel Sap systems landscape and as per your requirement i believe that the Production two is actually used for testing and contains the same data of Production one.
If that is the case normal Route is like DEV> QAS > TEST > PRD.
As you said its possible to draw TEST and PRD parallel from QAS : Follow normal procedure
1) first add your Production 2(test) system to the domain controller.
2) then add the route in STMS
Its same like adding a normal system nothing in special: For detail procedure please visit:
1) TMS DEMO LINK: http://scn.sap.com/docs/DOC-16372
2) Good link on TMS : http://scn.sap.com/docs/DOC-7643
3) Performance managemant and TMS DEMOS : http://scn.sap.com/docs/DOC-23060
5) Demo 2 ctd.. http://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/library/uuid/8037321f-1542-2c10-1caf-93813c0c9...
6)Demo 3 ctd.
7)http://scn.sap.com/docs/DOC-23407
Regards
alen
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
87 | |
10 | |
10 | |
10 | |
7 | |
6 | |
6 | |
5 | |
5 | |
4 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.