05-09-2013 7:14 AM
In our Retail IDES, I found I tried to change RP type "R1" for one DC, i can changed , but after save it is changed back to "ND", What happens?
05-09-2013 7:32 AM
Hi Bruce,
After saving the article, when you use MM42/MM43 make sure that you enter the same site (DC). You might have chosen a different validity area. Also check in the table MARC whether the change has been reflected.
Regards,
Vikram
05-09-2013 7:32 AM
Hi Bruce,
After saving the article, when you use MM42/MM43 make sure that you enter the same site (DC). You might have chosen a different validity area. Also check in the table MARC whether the change has been reflected.
Regards,
Vikram
05-09-2013 8:23 AM
Hi Vikram,
Thanks for your time ahead!
Actually I make defaults for validity area, so no errors here.
And I can input consumption manually and execute forecast, bu after save and back with MM42 and then found RP type was changed, but I can change it to back to 'R1" and test forecast. is it normal?
And I checked table MARC, found that that two other sites are listed there automatically, I will check further!