cancel
Showing results for 
Search instead for 
Did you mean: 

System not allowing to change status of CRTD to Rel in Quality Lot

Former Member
0 Kudos

Dear All,

I am not able to change status from CRTD to Rel,even though inspection plans is there,i have also tried to change date in QA02.The system show following message

"NO Inspection Plan Could be found"

When i see in details following error details are found in system

No inspection plan could be found

Message no. QA278

Diagnosis

A task list  could not be found for the selection criteria. The inspection setup for this material in the quality management view of the material master defines an inspection with a task list.

System Response

Sample calculation and inspection lot release are not possible.

Procedure

Check the:

  • Selection criteria
  • Material/task list assignment
  • Task list status
  • Task list usage

Pl help in this matter.

Regards

Vikas

Accepted Solutions (1)

Accepted Solutions (1)

anand_rao3
Active Contributor
0 Kudos

Answers (8)

Answers (8)

milind_kulkarni5
Contributor
0 Kudos

Hi,

Hi,

Go to QA32 ,Select line item - go to Insp.Lot tab- check the dates (of lot creation & insp. plan creation)- go to tab insp. specification - click on tab'Task list.spec & sample.calculation.

Check if CRTD status gets changed to REL or not.

Regards,

Milind

Former Member
0 Kudos

Dear,

The only reason behind this is date of lot creation and plan creation.

Please go in QA02 and change key date for the same. I will resolved.

Sandip

Former Member
0 Kudos

Hello Vikas,

kindly check for the deletion indicator in plan as well if it is not marked for deletion

former_member194876
Participant
0 Kudos

Dear Vikas,

If your Lot quantity is not within range of From Lot size to the To Lot Size of Inspection plan, then plan is not assigned.

For Ex: lot Qty 0.5 and

From lot size is 1 to To Lot Size is 999999, then Plan is not assigned.

former_member184536
Active Contributor
0 Kudos

Dear Vikas

If  you are not able to find out what have you missed.then make a new plan in the back date earlier than the date of material document and then assign that plan in QA02 with proper sampling procedure in inspection plan

I think you have missed out sampling procedure.

regards

Manish

Former Member
0 Kudos

Hi

Check the Status in Header area of task list

Check whether inspection lot is created before the creation of task list/insp plan

Check whether 2 task list is assigned to one material

Check whether insp plan is assigned to material or not.

Former Member
0 Kudos

Hello Vikas,

Please check the date of creation of inspection lot and inspection plan. The plan should be created before lot is created.

If not, please change key date in QA02 transaction and it should work.

Thanks

Sahil

Former Member
0 Kudos

Please restrain yourself by not posting duplicate threads.