Mater data in PP-PI from QM prespective.

Former Member
0 Kudos

Hi Every one,

Please explain me Mater data in PP-PI from QM prespective and what configuration is required for the same.

Accepted Solutions (0)

Answers (1)

Answers (1)

Former Member
0 Kudos
  1. Material Master (MM02) - In Process Inspection type assignment
  2. Master Inspection Characteristics (QS21)
  3. Routing - MIC Assignment to operations, Inspection Point Assignment in Routing header
former_member620323
Active Contributor
0 Kudos

Hi,

For the QM point of view:

you require Master inspection chara.(QS21), Inspection Method (QS31), Sampling procedure (QDV1) for sample size.

All this above masters assign to routing in tcode CA01 under Insp. Chara field.