on 04-09-2013 9:35 PM
Hi
I need to start a BPM based on a correlation. But the actual response of the correlation is not feeding to the subsequent mapping. Can i acheive this?
I have the scenario as Message A coming into BPM and message A is mapped to Message B in the transformation step. But this transformation should take place after the correlation of Message A with Message C using an ID as coorelation ID.
Hi Kalyan,
Check below document: http://saptechnical.com/Tutorials/XI/BPM/Fork3.htm
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Thanks guys for the info, it was actually the correlation which was failing because of the missing value.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Kalyan,
Also go through:
http://help.sap.com/saphelp_nw2004s/helpdata/en/6d/94364296f1b26be10000000a155106/content.htm
Make sure the correlation is defined correctly as per the tutorial given by Nabendu above.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
92 | |
11 | |
10 | |
9 | |
9 | |
7 | |
6 | |
5 | |
4 | |
4 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.